-
Notifications
You must be signed in to change notification settings - Fork 81
Open
Labels
0 - newNew issues that need assignment.New issues that need assignment.Calcite (design)Issues logged by Calcite designers.Issues logged by Calcite designers.calcite-componentsIssues specific to the @esri/calcite-components package.Issues specific to the @esri/calcite-components package.designIssues that need design consultation prior to, or during, development.Issues that need design consultation prior to, or during, development.enhancementIssues tied to a new feature or request.Issues tied to a new feature or request.estimate - 3A day or two of work, likely requires updates to tests.A day or two of work, likely requires updates to tests.impact - p3 - not time sensitiveUser set priority impact status of p3 - not time sensitiveUser set priority impact status of p3 - not time sensitivemonday.com syncMonday.com syncMonday.com syncp - highIssue should be addressed in the current milestone, impacts component or core functionalityIssue should be addressed in the current milestone, impacts component or core functionalityready for devIssues ready for development implementation.Issues ready for development implementation.visual changesIssues with visual changes that are added for consistency, but are not backwards compatible.Issues with visual changes that are added for consistency, but are not backwards compatible.
Description
Check existing issues
- I have checked for existing issues to avoid duplicates
Description
Provide consistent design styling updates to improve the component's UI/UX and consistency across the design system.
Acceptance Criteria
- Change
group-title
color to--calcite-color-text-1
- Change
padding-block
ofgroup-title
at each scale - Use a single divider between groups.
padding-inline
of divider matches that of Dropdown Item at each scale. - Add
padding-block
to divider to provide space between it and adjacent Dropdown Items.
See Figma file for full specs. Medium scale screenshot below.
Relevant Info
Part of 4.0's Phase III
Which Component
dropdown-item-group
Example Use Case
No response
Priority impact
impact - p3 - not time sensitive
Calcite package
- @esri/calcite-components
- @esri/calcite-components-react
- @esri/calcite-design-tokens
- @esri/eslint-plugin-calcite-components
Esri team
Calcite (design)
monday.com sync: #9367154651
Metadata
Metadata
Assignees
Labels
0 - newNew issues that need assignment.New issues that need assignment.Calcite (design)Issues logged by Calcite designers.Issues logged by Calcite designers.calcite-componentsIssues specific to the @esri/calcite-components package.Issues specific to the @esri/calcite-components package.designIssues that need design consultation prior to, or during, development.Issues that need design consultation prior to, or during, development.enhancementIssues tied to a new feature or request.Issues tied to a new feature or request.estimate - 3A day or two of work, likely requires updates to tests.A day or two of work, likely requires updates to tests.impact - p3 - not time sensitiveUser set priority impact status of p3 - not time sensitiveUser set priority impact status of p3 - not time sensitivemonday.com syncMonday.com syncMonday.com syncp - highIssue should be addressed in the current milestone, impacts component or core functionalityIssue should be addressed in the current milestone, impacts component or core functionalityready for devIssues ready for development implementation.Issues ready for development implementation.visual changesIssues with visual changes that are added for consistency, but are not backwards compatible.Issues with visual changes that are added for consistency, but are not backwards compatible.