Skip to content

ZohaibCodez/schedule-impact-statistical-analysis

Repository files navigation

📊 Schedule Impact Statistical Analysis

License: MIT Platform: Colab

A statistical analysis exploring how different student scheduling styles — Fixed, Flexible, and Hybrid — influence key outcomes like productivity, satisfaction, planning effectiveness, and lifestyle habits.


🎯 Project Objective

To investigate the impact of schedule types on various factors like productivity, satisfaction, and health habits using student survey data. The project applies statistical testing (T-tests) and data visualization to uncover trends and actionable insights.


📁 Project Structure


schedule-impact-statistical-analysis/
│
├── schedule_analysis.ipynb       ← Main Colab notebook for all analysis
├── charts/                       ← Visual outputs
│   ├── demographics/
│   ├── observations/
│   └── conclusion/
├── data/
│   ├── schedule_survey_cleaned.xlsx
│   └── data_dictionary.md
├── summary_table.csv             ← Key findings summary
├── report/
│   └── schedule-impact-presentation.pdf
├── LICENSE
├── .gitignore
└── README.md


📈 Analysis Overview

  • 🔍 Data Collection: Survey of students (N ≈ 150), aged 18–23
  • 🧪 Methods Used:
    • Independent samples T-test
    • KDE plots, histograms, bar charts
    • Grouped statistical summaries
  • 📊 Focus Areas:
    • Productivity
    • Scheduling satisfaction & control
    • Mental and physical well-being
    • AI scheduling tool usage

📊 Key Visualizations

  • Demographics → Age, Gender, Schedule Type Distributions
  • Observations → Productivity, Health, and Satisfaction vs. Schedule Type
  • Conclusion → Summarized insights and correlations

See charts in the /charts/ folder.


🖼️ Sample Visuals

Observation 1: Productivity by Schedule
Fig 1: Productivity distribution across schedule types (Fixed vs. Flexible/Hybrid)

Observation 3: Planning Method Effectiveness
Fig 2: Effectiveness score distribution for students using vs. not using planning tools

Observation 5: AI Tool Satisfaction
Fig 3: Scheduling satisfaction among AI tool users vs. non-users

Observation 7: Flexibility vs Satisfaction
Fig 4: Scheduling satisfaction distribution by flexibility importance

🧠 Key Insights

# Observation Result Significant?
1 Schedule Type vs. Productivity No clear difference ❌ No (p = 0.869)
2 Control vs. Satisfaction More control → Higher satisfaction ✅ Yes (p = 0.0012)
3 Planning vs. Effectiveness Planned → More effective ✅ Yes (p = 0.0078)
4 Schedule vs. Healthy Lifestyle No significant relationship ❌ No (Z = 1.315)
5 AI Use vs. Satisfaction No clear impact observed ❌ No (Z = 1.037)
6 Schedule vs. Work-Life Balance No significant difference ❌ No (p = 0.0738)
7 Flexibility vs. Satisfaction High flexibility → Different satisfaction ✅ Yes (p = 0.0058)

🔗 Full summary in: summary_table.csv


💡 Recommendations

  • Promote flexible scheduling in academic settings
  • Encourage digital calendar use and AI tools
  • Educate students on planning habits for better well-being

📝 How to Reproduce

  1. Clone or fork this repository
  2. Open schedule_analysis.ipynb in Google Colab
  3. Ensure data/schedule_survey_cleaned.xlsx is available
  4. Run the notebook to regenerate analysis and charts

👨‍💻 Contributors

This project was collaboratively created by:

ℹ️ All members contributed equally to this project as part of a collaborative academic effort.


📄 License

This project is open-sourced under the MIT License – see LICENSE for details.
You are free to use, adapt, and distribute this work with attribution.

About

Statistical analysis of how fixed vs. flexible schedules affect student performance

Topics

Resources

License

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Contributors 2

  •  
  •